- Adicionado estrutura completa do projeto - Configurado MCP server para Premiere Pro - Adicionado documentação e skills - Configurado Gitignore para o projeto
5.1 KiB
Executable File
Executive summary
Product: Premiere Pro MCP Market: Professional Adobe Premiere Pro workflow automation Date: 2026-08-22 Research scope: Evidence-backed productization and go-to-market preparation; no publication, spend, outreach, or paid generation. Status: Recommended plan; requires product-owner approval and licensed-host validation before commercial launch.
Objective
Turn the free, open-source Premiere Pro MCP core into a professional offer that teams can install, trust, repeat, and support. The proposed paid layer is a Companion experience and assisted design-partner program, not a restriction on the MIT-licensed core. [SRC-001]
Strongest verified opportunity
Premiere Pro MCP has an unusually broad documented workflow surface—287 registered core tools, 285 in the default profile, 335 with a connected UXP bridge, four resources, and ten workflows—plus 6,184 npm downloads from 2026-07-23 through 2026-08-21 and 210 GitHub stars / 33 forks. These are discovery signals, not evidence of retained or paying users. [SRC-001] [SRC-003] [SRC-004]
Recommended position
Reviewable workflow automation for Adobe Premiere Pro.
Recommended promise: “Automate repeatable Premiere work—with a preview before anything changes.” This direction follows INS-001, INS-002, and INS-005: customer-facing value should be a verified workflow outcome, not raw tool count or unproven autonomous editing.
Primary creative concept
CRE-001 — Inspect → Preview → Approve → Verify: a real, version-labeled product recording that shows a read-only connection check, a workflow plan, an explicit confirmation, and a structured result receipt. It maps to INS-001 and INS-004; it must not simulate a Premiere result.
First paid-ad hypothesis
AD-001 — High-intent search: for users searching a Premiere automation solution, outcome-led copy and a real workflow demo will generate more verified connection completions than “335 AI tools” copy. No spend or launch is authorized by this package. The test is based on INS-001, INS-005, and ANG-001.
First SEO cluster
SEO-001 — Premiere Pro automation / local-first workflow automation: begin with one conversion page that explains the safe connection check and one workflow page that demonstrates a supported use case. Actual keyword volumes, difficulty, rankings, and traffic are pending an Ahrefs export.
Important risks and missing evidence
| Item | Why it matters | State | Required gate |
|---|---|---|---|
| Real licensed-host evidence for PR #197 | The PR is draft; repository status does not prove customer-host outcomes. [SRC-005] | pending live verification | Test on licensed Premiere hosts before release claims. |
| Installation and activation baseline | Downloads do not show successful setup or repeat usage. [SRC-004] | pending live verification | Instrument privacy-safe funnel and validate event delivery. |
| Customer demand and willingness to pay | No interviews, testimonials, or price acceptance evidence were supplied. | pending live verification | 12–15 interviews and 5–8 assisted pilots. |
| Adobe AI Assistant overlap | Adobe's beta already covers organization, preparation, and stringouts. [SRC-006] | verified market constraint | Differentiate by client choice, workflow contracts, local-first setup, and receipts. |
| Marketplace status | Adobe review/publication state was not checked live in this run. | pending live verification | Check the authoritative vendor portal before any claim. |
Ordered next seven actions
- Validate PR #197 on licensed Premiere hosts using a versioned test matrix (
INS-003). - Create a claims registry across README, landing, npm, GitHub, Claude bundle, CEP, UXP, and marketplace channels (
INS-001). - Run 12–15 problem interviews with post supervisors, technical editors, and high-output independents (
INS-006). - Define three versioned workflow contracts: Project Intake, Platform Cutdowns, Delivery Preflight (
INS-005). - Prototype Studio Companion onboarding: detect, repair, safe-check, plan, receipt, support bundle (
INS-002). - Recruit 5–8 design partners only after the host and onboarding gates pass (
INS-006). Pricing remains a hypothesis. - Build the analytics baseline for verified connections and verified workflow receipts before considering ads or a public beta (
INS-004).
Recommendation
Proceed with a two-week proof-and-design-partner-readiness sprint. Do not launch paid plans, buy ads, publish pricing, or state production readiness until the completion gates in 08-approval-measurement.md are met.
Next actions
- Product owner selects the first workflow pack to validate.
- Engineering owner schedules host-matrix testing.
- Growth owner prepares the interview and design-partner materials as drafts only.
Owner: Product lead Approval needed: Approve the proof sprint and selected workflow scope; separate approval is required for outreach, pricing publication, paid ads, billing, marketplace publication, or paid media generation. Completion criteria: The next seven actions have named owners, evidence capture locations, and gated completion dates.